Woodstream HOA Paving Project Notice

Paving begins the week of November 30, weather permitting

RESIDENT ACTION REQUIRED

Remove all vehicles from each affected area by 7:00 a.m. on every scheduled workday. Vehicles left in restricted areas will be towed at the owner’s expense. Do not enter freshly paved areas until barriers are removed or the contractor or HOA confirms access is open.

What’s happening: Drive-lane paving, full-depth repairs in designated areas, parking-space restriping, and repainting of space numbers. A seal coat may be applied to parking areas in spring when conditions are suitable.

Parking-Space Preparation

Power washing: November 23–25, 9:00 a.m.–3:00 p.m. Please move vehicles from reserved parking spaces so the spaces can be cleaned for painting and striping.

Schedule at a Glance

Date Area Resident action / access
Nov. 23–25
9 a.m.–3 p.m.
Reserved parking spaces Move vehicles for power washing.
Mon., Nov. 30 Bubbling Brook & Walking Trail Vehicles out by 7 a.m.; closed until about noon Wed., Dec. 2.
Wed., Dec. 2 Forest Path
Lower half & circle
Vehicles below white line out by 7 a.m.; return after reopening; upper half remains open; remove again Thursday and Friday.
Thu., Dec. 3 Forest Path
Entire street
Vehicles out by 7 a.m.; return after reopening, then remove again Friday.
Fri., Dec. 4 Forest Path
Entire street
Vehicles out by 7 a.m. no evening access; expected reopening Saturday afternoon.
Mon., Dec. 7 Pebble Brook
Lower half & circle
Vehicles below white line out by 7 a.m.; upper half open; remove again Tuesday and Wednesday.
Tue., Dec. 8 Pebble Brook
Entire street
Vehicles out by 7 a.m.; return after reopening, then remove again Wednesday.
Wed., Dec. 9 Pebble Brook
Entire street
Vehicles out by 7 a.m., no evening access; expected reopening Thursday afternoon.

IMPORTANT—REOPENING TIMES ARE ESTIMATES: Wait until barriers are removed or the contractor or HOA confirms access is open.

Work Schedule & Access

Bubbling Brook and Walking Trail

  • Monday, November 30: Remove all vehicles by 7:00 a.m. Paving begins, and the road will remain closed through approximately noon Wednesday, December 2.
  • Tuesday, Dec. 1: Road remains closed.
  • Wednesday, Dec. 2: Road opens around noon.

Forest Path Way

  • Wed., Dec. 2—lower half and circle: Move vehicles below the painted white line by 7:00 a.m.; the upper half remains open. Return only after the area reopens that evening, then remove vehicles again by 7:00 a.m. Thursday.
  • Thu., Dec. 3—entire street: Remove all vehicles by 7:00 a.m. Return only after reopening that evening, then remove vehicles again by 7:00 a.m. Friday.
  • Fri., Dec. 4—entire street: Remove all vehicles by 7:00 a.m. Final surface applied; no evening access; expected reopening Saturday afternoon.

Pebble Brook Court

  • Mon., Dec. 7—lower half and circle: Move vehicles below the painted white line by 7:00 a.m.; the upper half remains open. Return only after the area reopens that evening, then remove vehicles again by 7:00 a.m. Tuesday.
  • Tue., Dec. 8—entire street: Remove all vehicles by 7:00 a.m. Return only after reopening that evening, then remove vehicles again by 7:00 a.m. Wednesday.
  • Wed., Dec. 9—entire street: Remove all vehicles by 7:00 a.m. Final surface applied; no evening access; expected reopening Thursday afternoon.

Parking and Towing

  • Vehicles remaining in restricted areas after 7:00 a.m. will be towed at the owner’s expense and liability; towing and storage fees may exceed $200.
  • Temporary parking may be available on Magic Leaf, Parklane Court, Running Creek, and Timber Brook Lane.
  • Do not block mailboxes, driveways, fire lanes, or emergency access routes.
  • Residents on single-family streets should use their driveways whenever possible.

Trash Collection and Schedule Updates

Trash collection may be adjusted; details will be shared separately. The paving schedule is weather dependent and may change because of cold temperatures, precipitation, or other conditions.

CHECK UPDATES: woodstream.org

QUESTIONS: board@woodstream.org

We understand that temporary parking changes, restricted access, and construction activity are inconvenient. In consultation with the contractor and community engineer, the HOA selected the best available approach to preserve safe resident access while allowing efficient work. Thank you for your patience, cooperation, and consideration for your neighbors.